快播在线视频-女人张开腿让男人桶个爽-久久久www.-人妻少妇熟女javhd-国产女人与zoxxxx另类-超碰国产精品久久国产精品99-成人免费在线视频观看-国产亚洲精品a在线-久久麻豆成人精品-亚洲最大色大成人av-欧洲亚洲国产精品-中文字幕三级人妻无码视频-亚洲日韩色图-小视频在线观看-成人av黄色-久久亚洲精品无码av大香大香-免费国产黄网站在线观看视频-国产老女人精品毛片久久-午夜久久一区-成人在线小视频

News

The CNOOC Offshore Pipe-laying Project Succeeds in Trial Laying<br/>Hilong Receives Approval for Official Operations

Date 2015-04-02

(April 2nd, 2015, Shanghai) After having successfully accomplished the pipe-laying trial for the CNOOC Offshore Pipe-laying Project, which was performed during mid-to-late March 2015, Hilong has received the approval document for official operations. This shows that everything goes well with Hilong’s CNOOC Offshore Pipe-laying Project. 


During mid-to-late March, Hilong employed the “Hilong 106” pipe-laying derrick barge to carry out trial laying in the sea area outside Zhoushan. Eighty-five pieces of pipes, which added up to 1,036 metres, were successfully laid under water after such processes as grinding, beveling, preheating, degaussing, line-up, welding, inspection and field joint coating. Also the rehearsals of both abandonment and collection of pipelines were performed in the trial.


The major equipment employed in this pipe-laying trial include world-class welding machines, tensioners, an AR winch and testing devices. The technicians and engineers of the relevant units of Hilong’s pipeline business also participated in the trial laying, providing technical and service support in respect of pipelines.


Senior executives from the CNOOC headquarters, CNOOC Shanghai as well as Sinopec inspected the trial laying site and attended the evaluation meeting on March 29th. They highly complemented Hilong on the result of the pipe-laying trial and project preparation. The General Manager of the Engineering Department of CNOOC, signed and issued on spot a document which approved of official laying.


Shawn Xiao, Vice President of Hilong and General Manager of Hilong Petroleum Offshore Engineering Co., Ltd., said, “We have encountered unfriendly sea conditions during the trial laying period; however, due to our sufficient and forward looking preparation, along with a well-trained technical team as well as the world-leading pipe laying equipment, our trial laying work has been orderly and efficiently carried out, with a satisfying result. This has laid a strong foundation for the subsequent official operations.”


(Hilong’s Note: Currently “Hilong 106” has commenced the official laying of pipelines for the CNOOC Pipe-laying Project.)