快播在线视频-女人张开腿让男人桶个爽-久久久www.-人妻少妇熟女javhd-国产女人与zoxxxx另类-超碰国产精品久久国产精品99-成人免费在线视频观看-国产亚洲精品a在线-久久麻豆成人精品-亚洲最大色大成人av-欧洲亚洲国产精品-中文字幕三级人妻无码视频-亚洲日韩色图-小视频在线观看-成人av黄色-久久亚洲精品无码av大香大香-免费国产黄网站在线观看视频-国产老女人精品毛片久久-午夜久久一区-成人在线小视频

News

Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

Date 2016-03-23

(March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
 

The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
 

Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

 

Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

The Site of the Rajani-5 Well